{"id":5257,"date":"2022-12-27T09:46:56","date_gmt":"2022-12-27T15:46:56","guid":{"rendered":"https:\/\/ishanews.org\/ishwarsprojects2\/?p=5257"},"modified":"2022-12-30T01:25:41","modified_gmt":"2022-12-30T07:25:41","slug":"145-december-28-2022-meeting-hall-foundation-completed","status":"publish","type":"post","link":"https:\/\/ishanews.org\/ishwarsprojects2\/2022\/12\/27\/145-december-28-2022-meeting-hall-foundation-completed\/","title":{"rendered":"#145  &#8211; December 28, 2022 &#8212; Meeting Hall Foundation Completed!"},"content":{"rendered":"<div class=\"postie-post\">\n<div>\n<div dir=\"auto\" style=\"overflow-wrap: break-word; -webkit-nbsp-mode: space; line-break: after-white-space;\">\n<div dir=\"auto\" style=\"overflow-wrap: break-word; -webkit-nbsp-mode: space; line-break: after-white-space;\">\n<div dir=\"auto\" style=\"overflow-wrap: break-word; -webkit-nbsp-mode: space; line-break: after-white-space;\">\n<div><span style=\"font-family: arial, helvetica, sans-serif; font-size: 14pt;\">Dear Friends,<\/span><\/div>\n<div>&nbsp;<\/div>\n<div><span style=\"font-family: arial, helvetica, sans-serif; font-size: 14pt;\">The Dera Building Committee is overjoyed to report that on December 13th ISHA\u2019s contractor completed the foundation for Ishwar\u2019s Meeting Hall just hours before the &#8220;snowstorm of the century&#8221; blanketed northern Wisconsin with two feet of snow and subzero temperatures. Interestingly, the snow actually provides excellent insulation between the cold air and the freshly buried concrete, ensuring that the foundation will remain unaffected by the Wisconsin winter!<\/span><\/div>\n<div><span style=\"font-family: arial, helvetica, sans-serif; font-size: 14pt;\">Here are some photos of the final phases of the construction work.<\/span><\/div>\n<div>&nbsp;<\/div>\n<div><span style=\"font-family: arial, helvetica, sans-serif; font-size: 14pt;\">Our excellent, local general contractor had the concrete forms built atop the footing.<\/span><\/div>\n<div><span style=\"font-family: arial, helvetica, sans-serif; font-size: 14pt;\"><img decoding=\"async\" src=\"https:\/\/ishanews.org\/ishwarsprojects2\/wp-content\/uploads\/2022\/12\/1-Dera-2022-hill-concrete-walls-foundation-7.jpeg\" alt=\"1 Dera 2022 - hill concrete walls foundation (7).jpeg\"><\/span><\/div>\n<div>&nbsp;<\/div>\n<div><span style=\"font-family: arial, helvetica, sans-serif; font-size: 14pt;\">The pumper truck and cement trucks arrive.<\/span><\/div>\n<div><span style=\"font-family: arial, helvetica, sans-serif; font-size: 14pt;\"><img decoding=\"async\" src=\"https:\/\/ishanews.org\/ishwarsprojects2\/wp-content\/uploads\/2022\/12\/2-Dera-2022-hill-concrete-walls-foundation-6.jpeg\" alt=\"2 Dera 2022 - hill concrete walls foundation (6).jpeg\"><\/span><\/div>\n<div>&nbsp;<\/div>\n<div><span style=\"font-family: arial, helvetica, sans-serif; font-size: 14pt;\">The weather-resistant crew filled the forms with warm concrete.<\/span><\/div>\n<div><span style=\"font-family: arial, helvetica, sans-serif; font-size: 14pt;\"><img decoding=\"async\" src=\"https:\/\/ishanews.org\/ishwarsprojects2\/wp-content\/uploads\/2022\/12\/3-Dera-2022-hill-concrete-walls-foundation-5.jpeg\" alt=\"3 Dera 2022 - hill concrete walls foundation (5).jpeg\"><\/span><\/div>\n<div>&nbsp;<\/div>\n<div><span style=\"font-family: arial, helvetica, sans-serif; font-size: 14pt;\">The next day, the forms were removed to reveal the lovely (and sturdy!) foundation walls for Ishwar\u2019s hall.<\/span><\/div>\n<div><span style=\"font-family: arial, helvetica, sans-serif; font-size: 14pt;\"><img decoding=\"async\" src=\"https:\/\/ishanews.org\/ishwarsprojects2\/wp-content\/uploads\/2022\/12\/4-Dera-2022-hill-concrete-walls-foundation-4.jpeg\" alt=\"4 Dera 2022 - hill concrete walls foundation (4).jpeg\"><\/span><\/div>\n<div>&nbsp;<\/div>\n<div><span style=\"font-family: arial, helvetica, sans-serif; font-size: 14pt;\">The embayments around the building represent the future locations of exterior doors.<\/span><\/div>\n<div><span style=\"font-family: arial, helvetica, sans-serif; font-size: 14pt;\"><img decoding=\"async\" src=\"https:\/\/ishanews.org\/ishwarsprojects2\/wp-content\/uploads\/2022\/12\/5-Dera-2022-hill-concrete-walls-foundation-3.jpeg\" alt=\"5 Dera 2022 - hill concrete walls foundation (3).jpeg\"><\/span><\/div>\n<div>&nbsp;<\/div>\n<div><span style=\"font-family: arial, helvetica, sans-serif; font-size: 14pt;\">The exterior wall was painted with a black waterproof coating.<\/span><\/div>\n<div><span style=\"font-family: arial, helvetica, sans-serif; font-size: 14pt;\"><img decoding=\"async\" src=\"https:\/\/ishanews.org\/ishwarsprojects2\/wp-content\/uploads\/2022\/12\/6-Dera-2022-hill-concrete-walls-foundation-1.jpeg\" alt=\"6 Dera 2022 - hill concrete walls foundation (1).jpeg\"><\/span><\/div>\n<div>&nbsp;<\/div>\n<div><span style=\"font-family: arial, helvetica, sans-serif; font-size: 14pt;\">Three-inch insulation was applied to the interior foundation walls.<\/span><\/div>\n<div><span style=\"font-family: arial, helvetica, sans-serif; font-size: 14pt;\"><img decoding=\"async\" src=\"https:\/\/ishanews.org\/ishwarsprojects2\/wp-content\/uploads\/2022\/12\/7-Dera-2022-hill-concrete-walls-foundation.jpeg\" alt=\"7 Dera 2022 - hill concrete walls foundation.jpeg\"><\/span><\/div>\n<div>&nbsp;<\/div>\n<div><span style=\"font-family: arial, helvetica, sans-serif; font-size: 14pt;\">The contractor then backfilled dirt on both sides of the walls with his agile compact track loader.<\/span><\/div>\n<div><span style=\"font-family: arial, helvetica, sans-serif; font-size: 14pt;\"><img decoding=\"async\" src=\"https:\/\/ishanews.org\/ishwarsprojects2\/wp-content\/uploads\/2022\/12\/8-Dera-2022-drone-hill-concrete-walls-foundation.jpeg\" alt=\"8 Dera 2022 - drone hill concrete walls foundation.jpeg\"><\/span><\/div>\n<div>&nbsp;<\/div>\n<div><span style=\"font-family: arial, helvetica, sans-serif; font-size: 14pt;\">Straw was spread over the walls to increase the insulation value for the buried foundation.<\/span><\/div>\n<div><span style=\"font-family: arial, helvetica, sans-serif; font-size: 14pt;\"><img decoding=\"async\" src=\"https:\/\/ishanews.org\/ishwarsprojects2\/wp-content\/uploads\/2022\/12\/11-Dera-2022-hill-concrete-walls-foundation-2.jpeg\" alt=\"11 Dera 2022 - hill concrete walls foundation (2).jpeg\"><\/span><\/div>\n<div>&nbsp;<\/div>\n<div><span style=\"font-family: arial, helvetica, sans-serif; font-size: 14pt;\">Drone photo looking south shows the west and north buried foundation walls that were completed in November, and the east and south walls that were completed in December.<\/span><\/div>\n<div><span style=\"font-family: arial, helvetica, sans-serif; font-size: 14pt;\"><img decoding=\"async\" src=\"https:\/\/ishanews.org\/ishwarsprojects2\/wp-content\/uploads\/2022\/12\/12-Dera-2022-drone-hill-concrete-walls-foundation.jpeg\" alt=\"12 Dera 2022 - drone hill concrete walls foundation.jpeg\"><\/span><\/div>\n<div>&nbsp;<\/div>\n<div><span style=\"font-family: arial, helvetica, sans-serif; font-size: 14pt;\">The huge storm in mid-December dropped two feet of heavy snow over the Bruce region. &nbsp;This photo was taken on December 26, when nearly all evidence of construction was buried under the deep snow.<\/span><\/div>\n<div><span style=\"font-family: arial, helvetica, sans-serif; font-size: 14pt;\"><img decoding=\"async\" src=\"https:\/\/ishanews.org\/ishwarsprojects2\/wp-content\/uploads\/2022\/12\/13-Dera-2022-Hill-foundation-covered-by-snow.jpeg\" alt=\"13 Dera 2022 - Hill foundation covered by snow.jpeg\"><\/span><\/div>\n<div>&nbsp;<\/div>\n<div><span style=\"font-family: arial, helvetica, sans-serif; font-size: 14pt;\">In the spring of 2023, we hope to begin installing the steel framework for the Meeting Hall. In addition to this work, there will be many seva projects available for visitors. ISHA welcomes all volunteers any time during the summer, and will be sponsoring these three long weekends for special events in 2023:<\/span><\/div>\n<ul>\n<li><span style=\"font-family: arial, helvetica, sans-serif; font-size: 14pt;\">&nbsp; &nbsp; &nbsp;Friday, May 26 to Monday, May 29 (Memorial Day Weekend) &#8211; Prashad Garden Preparation and Planting&nbsp;<\/span><\/li>\n<li><span style=\"font-family: arial, helvetica, sans-serif; font-size: 14pt;\">&nbsp; &nbsp; &nbsp;Friday, June 30 to Tuesday, July 4 (4th of July Weekend)<\/span><\/li>\n<li><span style=\"font-family: arial, helvetica, sans-serif; font-size: 14pt;\">&nbsp; &nbsp; &nbsp;Friday, September 15 to Monday, September 18 (Mitti Seva) &#8211; Prashad Garden Harvesting<\/span><\/li>\n<\/ul>\n<div>&nbsp;<\/div>\n<div>\n<div style=\"font-family: TimesNewRomanPSMT;\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 14pt;\">To offer seva for Ishwar\u2019s project, please visit&nbsp;<a href=\"https:\/\/ishanews.org\/voluntary-contribution\/\">https:\/\/ishanews.org\/voluntary-contribution\/<\/a>.&nbsp;<\/span><\/div>\n<div style=\"font-family: TimesNewRomanPSMT;\">\n<div>&nbsp;<\/div>\n<div><span style=\"font-family: arial, helvetica, sans-serif; font-size: 14pt;\">To learn more about the Meeting Hall, check out the dera website at&nbsp;<span style=\"color: #0000ff;\"><a href=\"https:\/\/dera.ishanews.org\/\">https:\/\/dera.ishanews.org<\/a><\/span><\/span><\/div>\n<div>\n<div style=\"margin: 0px; font-stretch: normal; line-height: normal; min-height: 12px;\">&nbsp;<\/div>\n<div style=\"margin: 0px; font-stretch: normal; line-height: normal; min-height: 12px;\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 14pt;\">Any questions related to Ishwar\u2019s dera can be directed to Jagannath\u2019s email at&nbsp;<a href=\"mailto:chairman@ishanews.org\">chairman@ishanews.org<\/a><\/span><\/div>\n<div style=\"margin: 0px; font-stretch: normal; line-height: normal; min-height: 12px;\">&nbsp;<\/div>\n<div style=\"margin: 0px; font-stretch: normal; line-height: normal;\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 14pt;\">With warmest regards,<\/span><\/div>\n<div style=\"margin: 0px; font-stretch: normal; line-height: normal;\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 14pt;\">Paul Bauer<\/span><\/div>\n<div style=\"margin: 0px; font-stretch: normal; line-height: normal;\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 14pt;\">ISHA Dera Building Committee<\/span><\/div>\n<\/div>\n<div style=\"margin: 0px; font-stretch: normal; line-height: normal;\">&nbsp;<\/div>\n<div style=\"margin: 0px; font-stretch: normal; line-height: normal;\">&nbsp;<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Dear Friends, &nbsp; The Dera Building Committee is overjoyed to report that on December 13th ISHA\u2019s contractor completed the foundation for Ishwar\u2019s Meeting Hall just hours before the &#8220;snowstorm of the century&#8221; blanketed northern Wisconsin with two feet of snow and subzero temperatures. Interestingly, the snow actually provides excellent insulation between the cold air and [&hellip;]<\/p>\n","protected":false},"author":11,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[27],"tags":[],"class_list":["post-5257","post","type-post","status-publish","format-standard","hentry","category-the-construction-chronicles"],"_links":{"self":[{"href":"https:\/\/ishanews.org\/ishwarsprojects2\/wp-json\/wp\/v2\/posts\/5257","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ishanews.org\/ishwarsprojects2\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ishanews.org\/ishwarsprojects2\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ishanews.org\/ishwarsprojects2\/wp-json\/wp\/v2\/users\/11"}],"replies":[{"embeddable":true,"href":"https:\/\/ishanews.org\/ishwarsprojects2\/wp-json\/wp\/v2\/comments?post=5257"}],"version-history":[{"count":2,"href":"https:\/\/ishanews.org\/ishwarsprojects2\/wp-json\/wp\/v2\/posts\/5257\/revisions"}],"predecessor-version":[{"id":5272,"href":"https:\/\/ishanews.org\/ishwarsprojects2\/wp-json\/wp\/v2\/posts\/5257\/revisions\/5272"}],"wp:attachment":[{"href":"https:\/\/ishanews.org\/ishwarsprojects2\/wp-json\/wp\/v2\/media?parent=5257"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ishanews.org\/ishwarsprojects2\/wp-json\/wp\/v2\/categories?post=5257"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ishanews.org\/ishwarsprojects2\/wp-json\/wp\/v2\/tags?post=5257"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}