{"id":4174,"date":"2019-07-21T14:29:26","date_gmt":"2019-07-21T19:29:26","guid":{"rendered":"https:\/\/ishanews.org\/ishwarsprojects2\/?p=4174"},"modified":"2019-07-21T14:38:25","modified_gmt":"2019-07-21T19:38:25","slug":"99-july-22-2019-pour-the-floor","status":"publish","type":"post","link":"https:\/\/ishanews.org\/ishwarsprojects2\/2019\/07\/21\/99-july-22-2019-pour-the-floor\/","title":{"rendered":"#99 &ndash; July 22, 2019 &ndash; Pour the Floor!"},"content":{"rendered":"<div>\n<p><span style=\"font-family: helvetica, arial, sans-serif;\">Dear Friends,<\/span><\/p>\n<div class=\"\" style=\"text-align: justify;\"><span style=\"font-family: helvetica, arial, sans-serif; font-size: 14pt;\">One of the recent big jobs at Ishwar\u2019s construction project in Bruce, Wisconsin was to pour the concrete floor for the ISHA Maintenance Shed\/Greenhouse. <\/span><span style=\"font-family: helvetica, arial, sans-serif; font-size: 14pt;\">Due to the size of the garage floor, the pour was divided into two sections, each of which is about half of the floor area.<\/span><\/div>\n<div class=\"\">&nbsp;<\/div>\n<div class=\"\"><span style=\"font-family: helvetica, arial, sans-serif; font-size: 14pt;\">But, before the concrete could be poured, the building had to be emptied, and the dirt floor had to be prepared.<\/span><\/div>\n<div class=\"\">&nbsp;<\/div>\n<div class=\"\"><span style=\"font-family: helvetica, arial, sans-serif; font-size: 14pt;\">Here\u2019s the shed before any cleaning.<\/span><\/div>\n<div class=\"\"><img decoding=\"async\" id=\"BA1A201D-1DF9-4062-8065-4DE8F3E18AC3\" class=\"\" src=\"https:\/\/ishanews.org\/ishwarsprojects2\/wp-content\/uploads\/2019\/07\/1-Dera-2019-inside-shed.jpg\"><\/div>\n<div class=\"\">&nbsp;<\/div>\n<div class=\"\"><span style=\"font-family: helvetica, arial, sans-serif; font-size: 14pt;\">And here\u2019s the building cleaned out!<\/span><\/div>\n<div class=\"\"><img decoding=\"async\" id=\"544EED5D-AF16-4685-8AD3-71D38B75ACF8\" class=\"\" src=\"https:\/\/ishanews.org\/ishwarsprojects2\/wp-content\/uploads\/2019\/07\/3-Dera-2019-shed-\u2013-Version-2-1.jpg\"><\/div>\n<div class=\"\">&nbsp;<\/div>\n<div class=\"\"><span style=\"font-family: helvetica, arial, sans-serif; font-size: 14pt;\">One component of the preparation was to dig the dirt out from around the walls to create insulated footings.<\/span><\/div>\n<div class=\"\"><img decoding=\"async\" id=\"89E5CED2-0AD3-4437-BC5C-E2516362976F\" class=\"\" src=\"https:\/\/ishanews.org\/ishwarsprojects2\/wp-content\/uploads\/2019\/07\/4-Dera-2019-shed-greenhouse-3-1.jpg\"><\/div>\n<div class=\"\">&nbsp;<\/div>\n<div class=\"\"><span style=\"font-family: helvetica, arial, sans-serif; font-size: 14pt;\">Foamboard insulation was installed to form the footings.<\/span><\/div>\n<div class=\"\"><img decoding=\"async\" id=\"61FAA163-66F7-4E39-A982-F32A1160199A\" class=\"\" src=\"https:\/\/ishanews.org\/ishwarsprojects2\/wp-content\/uploads\/2019\/07\/5-Dera-2019-shed-floor.jpg\"><\/div>\n<div class=\"\">&nbsp;<\/div>\n<div class=\"\"><span style=\"font-family: helvetica, arial, sans-serif; font-size: 14pt;\">The insulated footing boxes were filled with concrete. <\/span>&nbsp;<\/div>\n<div class=\"\"><img decoding=\"async\" id=\"845BC71D-BB31-4F52-8CA1-55C47E703A31\" class=\"\" src=\"https:\/\/ishanews.org\/ishwarsprojects2\/wp-content\/uploads\/2019\/07\/6-Dera-2019-shed-floor-5.jpg\"><\/div>\n<div class=\"\">&nbsp;<\/div>\n<div class=\"\"><span style=\"font-family: helvetica, arial, sans-serif; font-size: 14pt;\">Then, a base of gravel was spread and compacted by the volunteers.<\/span><\/div>\n<div class=\"\"><img decoding=\"async\" id=\"DBFF7C8E-1E14-4241-85E4-D81D9C9C69D4\" class=\"\" src=\"https:\/\/ishanews.org\/ishwarsprojects2\/wp-content\/uploads\/2019\/07\/7-Dera-2019-shed-floor-3.jpg\"><\/div>\n<div class=\"\">&nbsp;<\/div>\n<div class=\"\"><span style=\"font-family: helvetica, arial, sans-serif; font-size: 14pt;\">Wooden forms were built to contain the concrete.<\/span><\/div>\n<div class=\"\"><img decoding=\"async\" id=\"1A2AFC55-F408-4E5A-9AFB-E50681CACAF4\" class=\"\" src=\"https:\/\/ishanews.org\/ishwarsprojects2\/wp-content\/uploads\/2019\/07\/8-Dera-2019-shed-floor-1.jpg\"><\/div>\n<div class=\"\">&nbsp;<\/div>\n<div class=\"\"><span style=\"font-family: helvetica, arial, sans-serif; font-size: 14pt;\">A sevadar cuts rebar using a steel-cutting grinder.<\/span><\/div>\n<div class=\"\"><img decoding=\"async\" id=\"B50FB25D-2608-4046-ACA8-5A7728D54662\" class=\"\" src=\"https:\/\/ishanews.org\/ishwarsprojects2\/wp-content\/uploads\/2019\/07\/9-Dera-2019-shed-floor-2.jpg\"><\/div>\n<div class=\"\">&nbsp;<\/div>\n<div class=\"\"><span style=\"font-family: helvetica, arial, sans-serif; font-size: 14pt;\">And finally, a rebar grid is built across the floor, and we\u2019re ready to bring in the concrete.<\/span><\/div>\n<div class=\"\"><img decoding=\"async\" id=\"3FF9D0E4-70C4-4230-8966-3E8E152D4FC4\" class=\"\" src=\"https:\/\/ishanews.org\/ishwarsprojects2\/wp-content\/uploads\/2019\/07\/10-Dera-2019-shed-floor-4.jpg\"><\/div>\n<div class=\"\">&nbsp;<\/div>\n<div class=\"\"><span style=\"font-family: helvetica, arial, sans-serif; font-size: 14pt;\">In the next blog, the concrete trucks arrive!<\/span><\/div>\n<div class=\"\">&nbsp;<\/div>\n<div class=\"\">\n<div class=\"\" style=\"font-family: TimesNewRomanPSMT;\"><span class=\"\" style=\"font-family: helvetica, arial, sans-serif; font-size: 14pt;\">With warmest regards,<\/span><br class=\"\"><span class=\"\" style=\"font-family: helvetica, arial, sans-serif; font-size: 14pt;\">Paul Bauer<\/span><br class=\"\"><span class=\"\" style=\"font-family: helvetica, arial, sans-serif; font-size: 14pt;\">Chair of ISHA Building &amp; Fund-Raising Committee<\/span><\/div>\n<div class=\"\" style=\"font-family: TimesNewRomanPSMT;\">&nbsp;<\/div>\n<\/div>\n<div class=\"\" style=\"font-family: TimesNewRomanPSMT;\"><span class=\"\">&nbsp;<\/span><\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Dear Friends, One of the recent big jobs at Ishwar\u2019s construction project in Bruce, Wisconsin was to pour the concrete floor for the ISHA Maintenance Shed\/Greenhouse. Due to the size of the garage floor, the pour was divided into two sections, each of which is about half of the floor area. &nbsp; But, before the [&hellip;]<\/p>\n","protected":false},"author":11,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[27],"tags":[],"class_list":["post-4174","post","type-post","status-publish","format-standard","hentry","category-the-construction-chronicles"],"_links":{"self":[{"href":"https:\/\/ishanews.org\/ishwarsprojects2\/wp-json\/wp\/v2\/posts\/4174","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ishanews.org\/ishwarsprojects2\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ishanews.org\/ishwarsprojects2\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ishanews.org\/ishwarsprojects2\/wp-json\/wp\/v2\/users\/11"}],"replies":[{"embeddable":true,"href":"https:\/\/ishanews.org\/ishwarsprojects2\/wp-json\/wp\/v2\/comments?post=4174"}],"version-history":[{"count":1,"href":"https:\/\/ishanews.org\/ishwarsprojects2\/wp-json\/wp\/v2\/posts\/4174\/revisions"}],"predecessor-version":[{"id":4194,"href":"https:\/\/ishanews.org\/ishwarsprojects2\/wp-json\/wp\/v2\/posts\/4174\/revisions\/4194"}],"wp:attachment":[{"href":"https:\/\/ishanews.org\/ishwarsprojects2\/wp-json\/wp\/v2\/media?parent=4174"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ishanews.org\/ishwarsprojects2\/wp-json\/wp\/v2\/categories?post=4174"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ishanews.org\/ishwarsprojects2\/wp-json\/wp\/v2\/tags?post=4174"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}