{"id":3579,"date":"2018-09-07T17:25:08","date_gmt":"2018-09-07T22:25:08","guid":{"rendered":"https:\/\/ishanews.org\/ishwarsprojects2\/?p=3579"},"modified":"2018-09-07T17:42:48","modified_gmt":"2018-09-07T22:42:48","slug":"62-september-8-2018-getting-framed","status":"publish","type":"post","link":"https:\/\/ishanews.org\/ishwarsprojects2\/2018\/09\/07\/62-september-8-2018-getting-framed\/","title":{"rendered":"#62 &ndash; September 8, 2018 &ndash; Getting Framed!"},"content":{"rendered":"<div>\n<div class=\"\" dir=\"auto\" style=\"word-wrap: break-word; -webkit-nbsp-mode: space; line-break: after-white-space;\">\n<div class=\"\" dir=\"auto\" style=\"word-wrap: break-word; -webkit-nbsp-mode: space; line-break: after-white-space;\">\n<div class=\"\" dir=\"auto\" style=\"word-wrap: break-word; -webkit-nbsp-mode: space; line-break: after-white-space;\">\n<div class=\"\"><span class=\"\" style=\"font-family: helvetica, arial, sans-serif; font-size: 14pt;\">Dear Friends,<\/span><\/div>\n<div class=\"\"><span class=\"\" style=\"font-family: TimesNewRomanPSMT;\">&nbsp;<\/span><\/div>\n<div class=\"\"><span class=\"\" style=\"font-family: helvetica, arial, sans-serif; font-size: 14pt;\">During&nbsp;the last week, a small team of eager volunteers has been framing up the ISHA Maintenance Building in Bruce, Wisconsin.<\/span><\/div>\n<div class=\"\"><span class=\"\" style=\"font-family: helvetica, arial, sans-serif; font-size: 14pt;\">&nbsp;<\/span><\/div>\n<div class=\"\"><span class=\"\" style=\"font-family: helvetica, arial, sans-serif; font-size: 14pt;\">Today\u2019s blog is a construction diary which illustrates the progress that was made during each work day.<\/span><\/div>\n<div class=\"\">&nbsp;<\/div>\n<div class=\"\">\n<div class=\"\"><span style=\"font-family: helvetica, arial, sans-serif; font-size: 14pt;\"><b class=\"\">Wednesday, August 29<\/b><\/span><\/div>\n<div class=\"\"><span style=\"font-family: helvetica, arial, sans-serif; font-size: 14pt;\">Today, the workers began by installing the heavy beams (red beam) that connect the walls to the center post.<\/span><\/div>\n<\/div>\n<div class=\"\">&nbsp;<\/div>\n<div class=\"\"><img decoding=\"async\" id=\"2F9C80CD-EFA4-4C43-8256-35DBBE36E456\" class=\"\" src=\"https:\/\/ishanews.org\/ishwarsprojects2\/wp-content\/uploads\/2018\/09\/1-Dera-2018-Maintenance-Bldg.jpg\"><\/div>\n<div class=\"\">&nbsp;<\/div>\n<div class=\"\">\n<div class=\"\"><span style=\"font-family: helvetica, arial, sans-serif; font-size: 14pt;\"><b class=\"\">Thursday, August 30<\/b><\/span><\/div>\n<div class=\"\"><span class=\"\" style=\"font-family: helvetica, arial, sans-serif; font-size: 14pt;\">On this day, the team nailed together the wall frames that will separate the garage bays from the greenhouse.<\/span><\/div>\n<\/div>\n<div class=\"\">&nbsp;<\/div>\n<div class=\"\"><span class=\"\" style=\"font-family: helvetica, arial, sans-serif; font-size: 14pt;\">Here, the first wall section is raised.<\/span><\/div>\n<div class=\"\"><img decoding=\"async\" id=\"29503471-E2A7-4174-BE38-5386CE75CCFF\" class=\"\" src=\"https:\/\/ishanews.org\/ishwarsprojects2\/wp-content\/uploads\/2018\/09\/2-Dera-2018-Maintenance-Bldg-2.jpg\"><\/div>\n<div class=\"\">&nbsp;<\/div>\n<div class=\"\"><span style=\"font-family: helvetica, arial, sans-serif; font-size: 14pt;\">The next section is installed.<\/span><\/div>\n<div class=\"\"><img decoding=\"async\" id=\"E06A9FE6-EDE1-4C15-A70C-A8349E813012\" class=\"\" src=\"https:\/\/ishanews.org\/ishwarsprojects2\/wp-content\/uploads\/2018\/09\/Dera-2018-Maintenance-Bldg-3.jpg\"><\/div>\n<div class=\"\">&nbsp;<\/div>\n<div class=\"\">\n<div class=\"\"><span style=\"font-family: helvetica, arial, sans-serif; font-size: 14pt;\">And here, the wall has been completed, with a door opening at the far end.<\/span><\/div>\n<\/div>\n<div class=\"\"><img decoding=\"async\" id=\"37E8E420-9959-4C23-AD1C-1A6295080E14\" class=\"\" src=\"https:\/\/ishanews.org\/ishwarsprojects2\/wp-content\/uploads\/2018\/09\/3-Dera-2018-Maintenance-Bldg.jpg\"><\/div>\n<div class=\"\">&nbsp;<\/div>\n<div class=\"\"><span class=\"\" style=\"font-family: helvetica, arial, sans-serif; font-size: 14pt;\"><b class=\"\">Friday, August 31<\/b><br class=\"\">Today, the team works to install the long joists above the garage bays. These beams will serve as the ceiling for the garage, and the floor for the second-floor loft.<\/span><\/div>\n<div class=\"\"><span class=\"\" style=\"font-family: TimesNewRomanPSMT;\">&nbsp;<\/span><\/div>\n<div class=\"\"><img decoding=\"async\" id=\"52C18C76-EB4E-406B-9BC2-1444DD964853\" class=\"\" src=\"https:\/\/ishanews.org\/ishwarsprojects2\/wp-content\/uploads\/2018\/09\/4-Dera-2018-Maintenance-Bldg-1.jpg\"><\/div>\n<div class=\"\">&nbsp;<\/div>\n<div class=\"\"><img decoding=\"async\" id=\"321BD4F3-BA18-4128-9791-A9E8BE6B0C07\" class=\"\" src=\"https:\/\/ishanews.org\/ishwarsprojects2\/wp-content\/uploads\/2018\/09\/4-Dera-2018-Maintenance-Bldg-4.jpg\"><\/div>\n<div class=\"\">&nbsp;<\/div>\n<div class=\"\"><img decoding=\"async\" id=\"F1A72065-27D0-4767-A39C-4E6A4A471461\" class=\"\" src=\"https:\/\/ishanews.org\/ishwarsprojects2\/wp-content\/uploads\/2018\/09\/5-Dera-2018-Maintenance-Bldg-1.jpg\"><\/div>\n<div class=\"\">&nbsp;<\/div>\n<div class=\"\">\n<div class=\"\"><span class=\"\" style=\"font-family: helvetica, arial, sans-serif; font-size: 14pt;\"><b class=\"\">Saturday, September 1<\/b><\/span><\/div>\n<div class=\"\"><span class=\"\" style=\"font-family: helvetica, arial, sans-serif; font-size: 14pt;\">On this day, the carpenters finished installing the wooden decking (floor) for the second-floor loft. They also designed the staircase to the loft.<\/span><\/div>\n<\/div>\n<div class=\"\"><span class=\"\" style=\"font-family: TimesNewRomanPSMT;\">&nbsp;<\/span><\/div>\n<div class=\"\"><img decoding=\"async\" id=\"B787E516-C9EB-41A7-A9A8-05879B745025\" class=\"\" src=\"https:\/\/ishanews.org\/ishwarsprojects2\/wp-content\/uploads\/2018\/09\/6-Dera-2018-Maintenance-Bldg-3.jpg\"><\/div>\n<div class=\"\">&nbsp;<\/div>\n<div class=\"\">\n<div class=\"\"><span class=\"\" style=\"font-family: helvetica, arial, sans-serif; font-size: 14pt;\"><b class=\"\">Tuesday, September 4<\/b><\/span><\/div>\n<div class=\"\">\n<div class=\"\">\n<div class=\"\"><span class=\"\" style=\"font-family: helvetica, arial, sans-serif; font-size: 14pt;\">Today, the framers began to build the south, exterior wall of the second-floor loft.&nbsp;<\/span><\/div>\n<div class=\"\"><span class=\"\" style=\"font-family: helvetica, arial, sans-serif; font-size: 14pt;\">&nbsp;<\/span><\/div>\n<div class=\"\"><span class=\"\" style=\"font-family: helvetica, arial, sans-serif; font-size: 14pt;\">The arrow points to the partial wall.<\/span><\/div>\n<div class=\"\"><img decoding=\"async\" id=\"0B1DEA4B-B886-4C10-87E8-8B28E3FECE63\" class=\"\" src=\"https:\/\/ishanews.org\/ishwarsprojects2\/wp-content\/uploads\/2018\/09\/8-Dera-2018-Maintenance-Bldg.jpg\"><\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\">&nbsp;<\/div>\n<div class=\"\"><span class=\"\" style=\"font-family: helvetica, arial, sans-serif; font-size: 14pt;\">The arrow points to the full wall frame.<\/span><\/div>\n<div class=\"\">\n<div class=\"\"><img decoding=\"async\" id=\"966C13F6-CDA0-4720-AE91-05E2ABD4E750\" class=\"\" src=\"https:\/\/ishanews.org\/ishwarsprojects2\/wp-content\/uploads\/2018\/09\/9-Dera-2018-Maintenance-Bldg-2.jpg\"><\/div>\n<\/div>\n<div class=\"\">\n<div class=\"\">&nbsp;<\/div>\n<div class=\"\">\n<div class=\"\"><span class=\"\" style=\"font-family: helvetica, arial, sans-serif; font-size: 14pt;\"><b class=\"\">Wednesday, September 5<\/b><\/span><\/div>\n<\/div>\n<div class=\"\">\n<div class=\"\"><span class=\"\" style=\"font-family: helvetica, arial, sans-serif; font-size: 14pt;\">On this day, the sevadars framed up the southern exterior wall of the greenhouse.&nbsp;<\/span><\/div>\n<div class=\"\">&nbsp;<\/div>\n<\/div>\n<div class=\"\"><span style=\"font-family: helvetica, arial, sans-serif; font-size: 14pt;\">Here they are starting to lay out the shape of the wall.<\/span><\/div>\n<div class=\"\"><img decoding=\"async\" id=\"E4DB5123-CBFD-499A-98B7-1EDCCEAFC620\" class=\"\" src=\"https:\/\/ishanews.org\/ishwarsprojects2\/wp-content\/uploads\/2018\/09\/Dera-2018-Maintenance-Bldg-1.jpg\"><\/div>\n<div class=\"\">&nbsp;<\/div>\n<div class=\"\"><span style=\"font-family: helvetica, arial, sans-serif; font-size: 14pt;\">Here they have raised most of the framed wall. Arrow points to the wall.<\/span><\/div>\n<div class=\"\"><img decoding=\"async\" id=\"4A402620-256E-4156-91CE-31B3946D592F\" class=\"\" src=\"https:\/\/ishanews.org\/ishwarsprojects2\/wp-content\/uploads\/2018\/09\/Dera-2018-Maintenance-Bldg-2.jpg\"><\/div>\n<div class=\"\">&nbsp;<\/div>\n<div class=\"\"><span style=\"font-family: helvetica, arial, sans-serif; font-size: 14pt;\">A view from the garden, showing the first-floor greenhouse wall, and the second-floor loft wall.<\/span><\/div>\n<div class=\"\"><img decoding=\"async\" id=\"E91A1318-A365-4C09-9ECE-0320DA0B4FEF\" class=\"\" src=\"https:\/\/ishanews.org\/ishwarsprojects2\/wp-content\/uploads\/2018\/09\/10-Dera-2018-Maintenance-Bldg-1.jpg\"><\/div>\n<div class=\"\">&nbsp;<\/div>\n<div class=\"\"><span style=\"font-family: helvetica, arial, sans-serif; font-size: 14pt;\">These &#8220;three amigos&#8221; sevadars pose after a wildly successful and gratifying week of performing framing seva on Ishwar\u2019s project.<\/span><\/div>\n<div class=\"\"><img decoding=\"async\" id=\"AE800ABC-C008-4D79-B848-1EBC979D094D\" class=\"\" src=\"https:\/\/ishanews.org\/ishwarsprojects2\/wp-content\/uploads\/2018\/09\/11-Dera-2018-Maintenance-Bldg.jpg\"><\/div>\n<\/div>\n<div class=\"\">&nbsp;<\/div>\n<div class=\"\">\n<div class=\"\" style=\"font-family: TimesNewRomanPSMT;\"><span style=\"font-family: helvetica, arial, sans-serif; font-size: 14pt;\">With warmest regards,<\/span><br class=\"\"><span style=\"font-family: helvetica, arial, sans-serif; font-size: 14pt;\">Paul Bauer<\/span><br class=\"\"><span style=\"font-family: helvetica, arial, sans-serif; font-size: 14pt;\">Chair of ISHA Building &amp; Fund-Raising Committee<\/span><\/div>\n<div class=\"\" style=\"font-family: TimesNewRomanPSMT;\">&nbsp;<\/div>\n<\/div>\n<div class=\"\">&nbsp;<\/div>\n<div class=\"\">&nbsp;<\/div>\n<div class=\"\"><span class=\"\" style=\"font-family: TimesNewRomanPSMT;\">&nbsp;<\/span><\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Dear Friends, &nbsp; During&nbsp;the last week, a small team of eager volunteers has been framing up the ISHA Maintenance Building in Bruce, Wisconsin. &nbsp; Today\u2019s blog is a construction diary which illustrates the progress that was made during each work day. &nbsp; Wednesday, August 29 Today, the workers began by installing the heavy beams (red [&hellip;]<\/p>\n","protected":false},"author":11,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[27],"tags":[],"class_list":["post-3579","post","type-post","status-publish","format-standard","hentry","category-the-construction-chronicles"],"_links":{"self":[{"href":"https:\/\/ishanews.org\/ishwarsprojects2\/wp-json\/wp\/v2\/posts\/3579","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ishanews.org\/ishwarsprojects2\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ishanews.org\/ishwarsprojects2\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ishanews.org\/ishwarsprojects2\/wp-json\/wp\/v2\/users\/11"}],"replies":[{"embeddable":true,"href":"https:\/\/ishanews.org\/ishwarsprojects2\/wp-json\/wp\/v2\/comments?post=3579"}],"version-history":[{"count":1,"href":"https:\/\/ishanews.org\/ishwarsprojects2\/wp-json\/wp\/v2\/posts\/3579\/revisions"}],"predecessor-version":[{"id":3595,"href":"https:\/\/ishanews.org\/ishwarsprojects2\/wp-json\/wp\/v2\/posts\/3579\/revisions\/3595"}],"wp:attachment":[{"href":"https:\/\/ishanews.org\/ishwarsprojects2\/wp-json\/wp\/v2\/media?parent=3579"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ishanews.org\/ishwarsprojects2\/wp-json\/wp\/v2\/categories?post=3579"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ishanews.org\/ishwarsprojects2\/wp-json\/wp\/v2\/tags?post=3579"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}