{"id":2919,"date":"2017-05-22T22:23:24","date_gmt":"2017-05-23T03:23:24","guid":{"rendered":"http:\/\/ishanews.org\/ishwarsprojects2\/?p=2919"},"modified":"2017-05-29T11:05:32","modified_gmt":"2017-05-29T16:05:32","slug":"21-may-24-2017-the-dome-design","status":"publish","type":"post","link":"https:\/\/ishanews.org\/ishwarsprojects2\/2017\/05\/22\/21-may-24-2017-the-dome-design\/","title":{"rendered":"#21 &#8211; May 24, 2017 &#8211; The Dome Design!"},"content":{"rendered":"<div>\n<p><span style=\"font-size: 14pt;\">Dear Friends,<\/span><\/p>\n<div class=\"\"><span style=\"font-size: 14pt;\">Great news! &nbsp;ISHA\u2019s architects have delivered the nearly final design drawings for the ISHA Meeting Hall dome!<\/span><\/div>\n<div class=\"\"><span style=\"font-size: 14pt;\">&nbsp;<\/span><\/div>\n<div class=\"\"><span style=\"font-size: 14pt;\">During the last year, the design has undergone some major modifications. The biggest of which is the addition of a full basement to the building. &nbsp;This will allow us to install a large commercial kitchen that can be used to feed hungry satsangis in a large, circular dining hall that seats 200. &nbsp;Because the Meeting Hall is to be built on a hill, the basement can have a walkout on the east side, and natural light can be windowed into the dining hall.<\/span><\/div>\n<div class=\"\"><span style=\"font-size: 14pt;\">&nbsp;<\/span><\/div>\n<div class=\"\"><span style=\"font-size: 14pt;\">With the addition of a basement, we must now fit a large set of stairs and two elevators into the building. &nbsp;In addition, we now have space for a meeting room, a family room, and ISHA offices.<\/span><\/div>\n<div class=\"\"><span style=\"font-size: 14pt;\">&nbsp;<\/span><\/div>\n<div class=\"\"><span style=\"font-size: 14pt;\">If all goes well, we still hope to begin work in June or July. &nbsp;Stay tuned for a call for construction-site volunteers soon! &nbsp;To receive announcements for seva opportunities, make sure that you are on the ISHA email list (click on <a class=\"\" href=\"http:\/\/ishanews.org\">http:\/\/ishanews.org<\/a>), and subscribe to the ISHA Construction Chronicles blog (click on&nbsp;<a class=\"\" href=\"http:\/\/ishanews.org\/ishwarsprojects2\/the-construction-chronicles\/\">http:\/\/ishanews.org\/ishwarsprojects2\/the-construction-chronicles\/<\/a>).<\/span><\/div>\n<div class=\"\"><span style=\"font-size: 14pt;\">&nbsp;<\/span><\/div>\n<div class=\"\"><span style=\"font-size: 14pt;\">Below are 3D architectural images of the building viewed from three different directions. &nbsp;Note that the colors and textures shown on the building are not the final choices.<\/span><\/div>\n<div class=\"\"><span style=\"font-size: 14pt;\">&nbsp;<\/span><\/div>\n<div class=\"\"><span style=\"font-size: 14pt;\">&nbsp;<\/span><\/div>\n<div class=\"\"><span style=\"font-size: 14pt;\">1) &nbsp;3D image of the Dome, view to the northeast. The main entrance is on the right, and the west doors are on the left.<\/span><\/div>\n<div class=\"\"><span style=\"font-size: 14pt;\">&nbsp;<\/span><\/div>\n<div class=\"\"><span style=\"font-size: 14pt;\"><img decoding=\"async\" id=\"D55B8500-336C-4108-A943-887C0C015B7F\" class=\"\" src=\"http:\/\/ishanews.org\/ishwarsprojects2\/wp-content\/uploads\/2017\/05\/Dome-3D-May262017-view-NE.jpg\"><\/span><\/div>\n<div class=\"\"><span style=\"font-size: 14pt;\">&nbsp;<\/span><\/div>\n<div class=\"\"><span style=\"font-size: 14pt;\">&nbsp;<\/span><\/div>\n<div class=\"\"><span style=\"font-size: 14pt;\">2) &nbsp;3D image of the Dome, view to the northwest. The main entrance is on the left, and the balcony and basement entrance are on the right.<\/span><\/div>\n<div class=\"\"><span style=\"font-size: 14pt;\">&nbsp;<\/span><\/div>\n<div class=\"\"><span style=\"font-size: 14pt;\"><img decoding=\"async\" id=\"94BC4537-6EE8-47FB-9E14-B7DAD953D1E4\" class=\"\" src=\"http:\/\/ishanews.org\/ishwarsprojects2\/wp-content\/uploads\/2017\/05\/Dome-3D-May262017-view-NW.jpg\"><\/span><\/div>\n<div class=\"\"><span style=\"font-size: 14pt;\">&nbsp;<\/span><\/div>\n<div class=\"\"><span style=\"font-size: 14pt;\">&nbsp;<\/span><\/div>\n<div class=\"\"><span style=\"font-size: 14pt;\">3) &nbsp;3D image of the Dome, view to the southwest. The offices at rear of the building are to the right, and the balcony and basement entrance are on the left.<\/span><\/div>\n<div class=\"\"><span style=\"font-size: 14pt;\">&nbsp;<\/span><\/div>\n<div class=\"\"><span style=\"font-size: 14pt;\"><img decoding=\"async\" id=\"8B3A9015-AF16-43ED-A76C-FB9276578B98\" class=\"\" src=\"http:\/\/ishanews.org\/ishwarsprojects2\/wp-content\/uploads\/2017\/05\/Dome-3D-May262017-view-SW.jpg\"><\/span><\/div>\n<div class=\"\"><span style=\"font-size: 14pt;\">&nbsp;<\/span><\/div>\n<div class=\"\">\n<div class=\"\"><span style=\"font-size: 14pt;\">With Warmest Regards,<\/span><br class=\"\"><span style=\"font-size: 14pt;\">Paul Bauer<\/span><br class=\"\"><span style=\"font-size: 14pt;\">Chair of ISHA Building &amp; Fund-Raising Committee<\/span><\/div>\n<\/div>\n<div class=\"\"><span style=\"font-size: 14pt;\">&nbsp;<\/span><\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Dear Friends, Great news! &nbsp;ISHA\u2019s architects have delivered the nearly final design drawings for the ISHA Meeting Hall dome! &nbsp; During the last year, the design has undergone some major modifications. The biggest of which is the addition of a full basement to the building. &nbsp;This will allow us to install a large commercial kitchen [&hellip;]<\/p>\n","protected":false},"author":11,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[27],"tags":[],"class_list":["post-2919","post","type-post","status-publish","format-standard","hentry","category-the-construction-chronicles"],"_links":{"self":[{"href":"https:\/\/ishanews.org\/ishwarsprojects2\/wp-json\/wp\/v2\/posts\/2919","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ishanews.org\/ishwarsprojects2\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ishanews.org\/ishwarsprojects2\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ishanews.org\/ishwarsprojects2\/wp-json\/wp\/v2\/users\/11"}],"replies":[{"embeddable":true,"href":"https:\/\/ishanews.org\/ishwarsprojects2\/wp-json\/wp\/v2\/comments?post=2919"}],"version-history":[{"count":1,"href":"https:\/\/ishanews.org\/ishwarsprojects2\/wp-json\/wp\/v2\/posts\/2919\/revisions"}],"predecessor-version":[{"id":2938,"href":"https:\/\/ishanews.org\/ishwarsprojects2\/wp-json\/wp\/v2\/posts\/2919\/revisions\/2938"}],"wp:attachment":[{"href":"https:\/\/ishanews.org\/ishwarsprojects2\/wp-json\/wp\/v2\/media?parent=2919"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ishanews.org\/ishwarsprojects2\/wp-json\/wp\/v2\/categories?post=2919"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ishanews.org\/ishwarsprojects2\/wp-json\/wp\/v2\/tags?post=2919"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}